Search for:

Please complete the following form.
Once completed, your information will be emailed to our service team at: service@galvt.us.
Once reviewed and a confirmation email will be sent to verify your “Request to pull a Low Voltage Permit” before dispatching our LVT license holder in that area.

Pulling a LVT permit without actually doing the work (installation) requires a minimum of one (1) possibly two (2)
trips to the premise.

1st visit is before the LVT inspection to ensure that the work meets all of the National Electrical Code requirements.
2nd visit is to walk the site with the inspector and may or may not be required.

Name of person requesting the permit
Do you have a company name
Your email address
Describe the reason you need a Low Voltage Permit
Construction Superintendant
Construction Superintendant
Permit number issued by county/city for the electrical work.
Example: 12 speaker 3 sub woofer 4 RG6 coax 4 HDMI tv 3 HDMI wall plate 24 data cables 27 Voice cables