Low Voltage Permitting
Low‑Voltage Permit Pulling Services
Professional. Compliant. Fast.
Low‑voltage installations — including security systems, access control, data cabling, audio/video, and communications wiring — often require permits to remain compliant with local building codes. Navigating municipal requirements can be time‑consuming and confusing for contractors and property owners.
Our team handles the entire permitting process from start to finish, ensuring your project stays on schedule and fully compliant.
📌 What We Do
We manage every step of the low‑voltage permitting process:
- Research jurisdiction‑specific requirements
- Prepare and submit permit applications
- Upload plans, diagrams, and supporting documents
- Coordinate with municipal reviewers
- Track approval status and provide updates
- Deliver final permit documentation upon approval
You focus on the installation — we handle the paperwork.
💼 Who This Service Is For
- Security system installers
- Access control integrators
- Structured cabling contractors
- AV installers
- General contractors
- Property owners needing compliant installations
⭐ Why Choose Us
- Deep familiarity with low‑voltage permitting requirements
- Fast turnaround and proactive communication
- Accurate documentation and clean submissions
- Reduced project delays
- Transparent, predictable pricing
Pricing
Standard Low‑Voltage Permit Pull
$149 per permit Includes:
- Application preparation
- Document uploads
- Municipal submission
- Status tracking
- Delivery of approved permit
Expedited Submission (Optional)
+$75 Priority handling with same‑day submission when all documents are provided.
Plan / Diagram Preparation (Optional)
$95 per project For clients who need basic wiring diagrams or system layout drawings.
Municipal Fees
Municipal permit fees vary by jurisdiction and are billed at cost with no markup.
Volume Discounts
For contractors submitting 10+ permits per month, custom pricing is available.
Process Overview
- Collect Project Details We gather the required information through our online intake form.
- Prepare Documentation We review your materials and prepare the application package.
- Submit to Municipality We handle the entire submission process.
- Track & Communicate You receive updates as the permit moves through review.
- Deliver Final Permit Approved permit documents are sent directly to you.
Get Started
We make compliance simple. Whether you handle one project a year or dozens each month, our team ensures your low‑voltage installations stay fully permitted and inspection‑ready.
